Construction / Defects

Defects get spotted everywhere. Convoe gets them closed.

From a walk-through photo or a quick message, Kai logs the defect with location and trade, assigns it, and needs an after photo before it closes.

Free crew appWeb, iOS & AndroidBuilt in Melbourne
Convoe — Chats · #90-collins-st
#
90-collins-st
Spacez · site channel · 14 members
Mon 2 Nov 2026
Today
SC
Sarah Chen Walk-through · 10:22 am
Cracked tile at shower hob in 2.04, tiler to replace.
Kai detected a defectOnly you can see this
Cracked tile at shower hob, unit 2.04
Trade
Coastline Tiling
Tiled 2.04 · from programme
Location
Unit 2.04 · ensuite
“shower hob in 2.04”
Due
Fri 6 Nov 2026
Before PCI walk
Message #90-collins-st
The way it works today

Why defects slip through.

01

Lists in notebooks

Walk-through notes get typed up days later, if they get typed up.

02

“It’s done” — it isn’t

Trades close items without anyone checking the work.

03

Hundreds of items at PCI

Defects pile up at the end instead of closing as you go.

The workflow · as it runs in Convoe

From the message to a closed record.

Every defect follows the same 5 steps. Kai does the paperwork; people make the calls.

  1. 1

    Chat or walk-through

    Snap it on the walk-through, or mention it in chat.

  2. 2

    Kai detects

    Location, trade and priority from the photo and the words.

  3. 3

    Trade assigned

    The subcontractor gets the photo and a due date.

  4. 4

    Photo evidence

    An after photo is required to close.

  5. 5

    Raiser verifies

    Checked against the before photo, then signed off.

From one week on 90 Collins St

Said on site. Filed by Kai.

Sarah Chen · walk-through · 9:40 amPaint drip on the L2 corridor ceiling near 2.06.
Kai catches it
DEF-062 · Paint drip, L2 corridor
Brushline Painting · due Thu 5 Nov
Tom Hadley · #90-collins-st · 12:15 pmShower screen leaking in 2.04 again. Third time.
Kai catches it
DEF-063 · Shower screen leak, 2.04
Glazier · marked high, repeat defect
Emma Walsh · voice note · 2:50 pmDoor D02 slams in the lobby. Closer needs adjusting.
Kai catches it
DEF-060 · D02 closer adjustment
Spacez carpentry · due Wed 4 Nov
In Tasks

No separate register. It’s a tab in Tasks.

Every defect is a task with a type. Pick the Defects tab to filter, group by project and open any record, with the message it came from.

  • Number, issued in order
  • Defect and exact location
  • Trade responsible
  • Priority and due date
  • Before photo
  • After photo
  • Verified by and when
Convoe — Tasks · Defects

Tasks

90 Collins St
No.DefectTradeDueStatusSource
DEF-061Cracked tile at shower hob, unit 2.04Coastline TilingFri 6 NovOpenChat
DEF-060Door closer slamming — D02 lobbySpacez carpentryWed 4 NovIn progressChat
DEF-058Paint touch-up, L1 corridorBrushline PaintingFri 30 OctOverdueChat
DEF-055Silicone gap, kitchenette splashbackSpacez carpentryTue 27 OctVerifiedChat
Chat or walk-through → Kai detects → Trade assigned → Photo evidence → Raiser verifies

Start with one site.

Add the crew, keep chatting the way you already do, and let Kai turn it into the record.

Free crew appWeb, iOS & AndroidBuilt in Melbourne